The Inspection Work Before Operating Concrete Batching Plant

Sep 18, 2017

Before running the concrete batching plant , the main points to check as following:
1. The transmission of the mixing body and the supporting mechanism, the moving parts, bins’ doors, the hopper door, the track and so on, make sure they are not stuck. The right side of the lubricating oil box is highly qualified.
2. open the valve to discharge too much water in the gas-water separator of gas system, and open the drain plug of the air tank to discharge the oil - water mixture.
3. The hoisting hopper or winding of the steel wire rope is correct, the steel wire rope and pulley are in accordance with the regulations, and the brake is sensitive and effective for lifting the hopper.
4. The bolts of each section are fastened, and the feeding and discharging valves are free of excessive wear, and the belts are properly fastened.
5. All control and display parts of the weighing device are normal and its accuracy is in accordance with the regulations.
6. The electrical devices can effectively control mechanical movements, and there is no obvious damage to the contact points,also dynamic and static contact.