Maintenance of concrete mixing plant after operation in winter and spring cold season
Maintenance of concrete mixing plant after operation in winter and spring cold season
Concrete mixing station is playing an important role in the construction of construction works. For the use of the concrete mixing station, in addition to the preparatory work and correct operation accident, the maintenance of the
operation fluid can not be ignored. Henan Huaning Machinery & Equipment Co., Ltd introduces the maintenance of concrete mixing plant after operation.
1. After the completion of the work, the gate of bulk cement tank shall be closed and all the cement in the screw tube shall be transported out. No cement shall remain in the tube.
2. Thoroughly clean the machinery and the site. The concrete in the mixing drum must be cleaned. The tool holder and edge of the weighing system should be cleaned carefully to ensure the precision of weighing.
3. Drain the air compressor and clean the additive pipe.
4. Maintain the concrete mixing station, add lubricating oil (grease) to each lubrication point, and oil the parts needing protection to prevent rust.
5. Clean the water in the pipeline after the winter operation.