common problems of the mixing system in the mixing plant
May 16, 2018
For the belt feeding concrete batch plant, if the slipping occurs when the belt is under loading in the rainy day, it will bring unnecessary trouble to the construction. So, if we can avoid the occurrence of this phenomenon in advance? First
May 16, 2018
1, The first continuous operation time of concrete batching plant shall not be more than 60 minutes. 2, The maximum temperature of the pump bearing shall not be higher than 80 ℃, the bearing temperature shall not be 40 ℃ higher than the
Nov 02, 2017
The main points to check before running the concrete batching plant.
Sep 18, 2017
How to strengthen the control measures of dust in the concrete mixing station?
Sep 01, 2017
Before the concrete batching plant is established, site selection is also important. C oncrete batching plant manufacturer Huaning company talk about the key points need to be grasped as following: 1. Choose a place of moderate geographical
Aug 21, 2017
In the working process of concrete batching plant, concrete batching machine is an important link of the whole production line. Proper usage and protection of batching machine will bring you long time benefits. lets see how to correctly ins
Aug 07, 2017
The production of concrete batching plant is based on the processing of raw materials. There are lots of raw materials used in concrete batching plants such as sand, stone, cement, fly ash, slag, admixture, water, etc. Cement is a kind of p
Jul 31, 2017
1.Abnormal sound of mixer: Check whether the cover is loose or not, whether the bearings have any problems, whether lubricant is followed-up. 2.The pneumatic door of the batching machine cant be closed tightly or opened: Check the gap of ai
Jul 21, 2017
For winter construction, the impact of temperature is the primary concern of the entire construction process to ensure the appropriate temperature of construction materials, construction plays an important role in the project.
Jul 21, 2017